Close Menu
    Facebook X (Twitter) Instagram
    SciTechDaily
    • Biology
    • Chemistry
    • Earth
    • Health
    • Physics
    • Science
    • Space
    • Technology
    Facebook X (Twitter) Pinterest YouTube RSS
    SciTechDaily
    Home»Space»NASA Artemis I Moon Rocket Ready To Roll Out To Launch Pad
    Space

    NASA Artemis I Moon Rocket Ready To Roll Out To Launch Pad

    By NASAAugust 16, 2022No Comments3 Mins Read
    Facebook Twitter Pinterest Telegram LinkedIn WhatsApp Email Reddit
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email Reddit
    SLS Orion High Bay 3 VAB
    In this view looking up in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, all of the work platforms that surround the Artemis I Space Launch System (SLS) and Orion spacecraft are fully retracted. Credit: NASA/Glenn Benson

    Engineers and technicians at NASA’s Kennedy Space Center in Florida have completed the final testing and checkouts of the Artemis I Moon rocket ahead of rolling out to Launch Pad 39B. NASA is targeting as soon as 9 p.m. EDT (6 p.m. PDT) on Tuesday, August 16 for rollout ahead of a targeted August 29 launch.

    Yesterday, the crawler-transporter rolled inside the Vehicle Assembly Building (VAB) and under the Space Launch System rocket and Orion spacecraft. Teams are currently working to prepare the integrated stack for rollout.

    Moonikin Secured in Seat in Artemis I Orion Crew Module
    A view of Moonikin “Campos” secured in a seat inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on August 3, 2022. Credit: NASA

    Over the weekend the team completed testing of the flight termination system, which marked the final major activity prior to closing out the rocket and retracting the final access platforms in the VAB.

    The agency will provide a live stream of the rollout beginning at 3 p.m. EDT (12 p.m. PDT) Tuesday, August 16 on the NASA Kennedy YouTube channel.

    Manikins Installed in Artemis I Orion Crew Module Passenger Seats
    Two manikins are installed in the passenger seats inside the Artemis I Orion crew module atop the Space Launch System rocket in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on August 8, 2022. As part of the Matroshka AstroRad Radiation Experiment (MARE) investigation, the two female manikins – Helga and Zohar – are equipped with radiation detectors, while Zohar also wears a radiation protection vest, to determine the radiation risk on its way to the Moon. Credit: NASA/Frank Michaux

    Artemis I is the first integrated test of NASA’s deep space exploration systems: the Orion spacecraft, Space Launch System (SLS) rocket, and the ground systems at Kennedy Space Center in Cape Canaveral, Florida. It is an uncrewed flight test, the first in a series of increasingly complex missions to the Moon. Through Artemis, NASA will land the first woman and the first person of color on the Moon, paving the way for a long-term lunar presence and serving as a stepping stone to send astronauts to Mars.

    Artemis I Integrated Testing

    Never miss a breakthrough: Join the SciTechDaily newsletter.
    Follow us on Google and Google News.

    ARTEMIS Mission Kennedy Space Center NASA Rocket Space Launch System
    Share. Facebook Twitter Pinterest LinkedIn Email Reddit

    Related Articles

    NASA Artemis I Wet Dress Rehearsal Update: Go for Proceed for Tanking

    NASA Artemis I Wet Dress Rehearsal Countdown Progressing, ICPS Powered Up

    NASA Teams Proceeding With Overnight Operations for Artemis I Wet Dress Rehearsal

    NASA Teams Continue To Monitor Severe Weather Ahead of Artemis I Wet Dress Rehearsal

    NASA Artemis I Launch Countdown 101

    NASA Go for Artemis I Wet Dress Rehearsal of SLS Rocket, Orion Spacecraft, and Exploration Ground Systems

    We Are Going! Massive Artemis I Moon Rocket Arrives at Launch Pad [Gallery]

    First Platforms Are Retracted Ahead of NASA Artemis I First Rollout To Launch Pad

    Artemis I Progress Continues in NASA’s Vehicle Assembly Building

    Leave A Reply Cancel Reply

    • Facebook
    • Twitter
    • Pinterest
    • YouTube

    Don't Miss a Discovery

    Subscribe for the Latest in Science & Tech!

    Trending News

    These Toads Are Surviving a Deadly Fungus – Scientists May Finally Know Why

    These Brain Cells May Explain Why We Eventually Have To Sleep

    Tomatoes Contain an Invisible Ingredient With Surprising Effects on Liver Health

    World’s First Heat-Powered Cooling System Turns Waste Heat Into Cold

    Antarctica Gained a Record 695 Billion Tons of Ice in Just Two Years

    Don’t Miss: A Brilliant Venus and Glowing Harvest Moon Light Up the Sky

    New Twist on the Einstein Problem Reveals Unexpected Physics

    JWST Captures Stunning Evidence of How Supermassive Black Holes Feed

    Follow SciTechDaily
    • Facebook
    • Twitter
    • YouTube
    • Pinterest
    • Newsletter
    • RSS
    SciTech News
    • Biology News
    • Chemistry News
    • Earth News
    • Health News
    • Physics News
    • Science News
    • Space News
    • Technology News
    Recent Posts
    • Scientists Discover a Hidden Defect That Could Explain Why IBD Keeps Coming Back
    • Millions Take Blood Pressure Drugs, but Many May Be Missing Their Heart-Protective Benefits
    • Could Alien Life Be Conscious in Ways We Can’t Imagine?
    • Scientists Develop a Fruit Wash That Removes Pesticide Residues and Keeps Produce Fresh Longer
    • Scientists May Have Finally Explained Why Astronauts Get Constipated in Space
    Copyright © 1998 - 2026 SciTechDaily. All Rights Reserved.
    • Science News
    • About
    • Contact
    • Editorial Board
    • Privacy Policy
    • Terms of Use

    Type above and press Enter to search. Press Esc to cancel.