NASA’s Massive Artemis I Moon Rocket To Depart Launch Pad 39B Today
At approximately 5:30 p.m. ET today (April 25, 2022), NASA’s Artemis I Moon rocket is scheduled to leave launchpad 39B atop the crawler-transporter and begin…
At approximately 5:30 p.m. ET today (April 25, 2022), NASA’s Artemis I Moon rocket is scheduled to leave launchpad 39B atop the crawler-transporter and begin…
Plasma-based rocket designed for deep space exploration lasts longer and generates high power. The increased interest in deep-space travel has necessitated the development of powerful,…
Teams concluded today’s wet dress rehearsal test at approximately 5:10 p.m. EDT after observing a liquid hydrogen (LH2) leak on the tail service mast umbilical,…
The Space Launch System rocket’s interim cryogenic propulsion stage (ICPS) and boosters were powered up overnight. Teams are in the process of clearing all non-essential…
The mission management team for Artemis I met this morning to review the status of operations and continues to press ahead toward terminal countdown for…
At approximately 5 p.m. EDT today (April 12, 2022), the launch team arrived at their stations inside the Launch Control Center at NASA’s Kennedy Space…
NASA is planning to proceed with a modified wet dress rehearsal, primarily focused on tanking the core stage, and minimal propellant operations on the interim…
In continued preparations for the Artemis I wet dress rehearsal test, with tanking targeted for Monday, teams encountered an issue maintaining helium purge pressure on…
Teams are preparing for the next attempt to at the Artemis I wet dress rehearsal, pending range availability and restoration of propellants and gases during…
During the wet dress rehearsal, teams at NASA’s Kennedy Space Center in Florida will load cryogenic or super-cold propellants into the Space Launch System (SLS)…
The Artemis I team has ended today’s attempt at the wet dress rehearsal test at 5 p.m. The countdown ended after partially loading liquid oxygen…
The countdown for the wet dress rehearsal has resumed at 10:52 a.m. EDT and clocks have picked back up at T-6 hours, 40 minutes on…
At approximately 7:40 a.m. EDT, the mission management team chair gave the “go” to proceed with tanking the rocket for the Artemis I wet dress…
NASA is targeting Monday, April 4, to resume the Artemis I wet dress rehearsal test. The test was stopped Sunday, April 3 prior to tanking…
Teams have decided to scrub tanking operations for the wet dress rehearsal due to loss of ability to pressurize the mobile launcher. The fans are…
At approximately 6:45 a.m. EDT, the launch director and mission management team chair gave the “go” to begin tanking the rocket. Meteorologists with Space Launch…
The Artemis I launch team continues to press ahead through the wet dress rehearsal countdown. During the overnight hours after determining four lightning strikes at…
Engineers confirmed there were four lightning strikes to the lightning towers within the perimeter of Launch Pad 39B. Teams have determined the first three were…